Search


Oct. 2025 community meeting: Greenway expansion project and Adopt-A-Lot programs need your input | The Homepage
The Oct. 14 Greater Hazelwood hybrid community meeting saw lively discussions about land use throughout the neighborhood and city. A lifelong resident proposed building a year-round baseball facility below the tracks, and staff from the Department of City Planning invited feedback about the Adopt-A-Lot program and expanding the greenway system.
Nov 16 min read


4MR talk and tour revives flood relief, green infrastructure conversation | The Homepage
On Oct. 3, about 65 people gathered at the City Reformed Presbyterian Church in The Run to discuss solutions to the neighborhood’s flooding. The discussion has occurred repeatedly over the years, at times in the same basement assembly room when it was owned by International Union of Operating Engineers Local 95.
Oct 315 min read


Could Hazelwood, 4MR be on the Pittsburgh 2025 chopping block? | The Homepage
Eighty people were gathered around tables at the Energy Innovation Center in the Hill District on Oct. 22, talking very seriously about the future of Pittsburgh.
The discussions were about three possible scenarios to guide the Pittsburgh 2050 Comprehensive Plan. Those three scenarios gave the attendees a choice: Do they want a plan that makes the city better by focusing on housing, or jobs, or climate resilience?
Oct 314 min read

.png)
